{"product_id":"vrabocry-100-3mm-3v-20ma-29mm-bulb-pcs-warm-white-led-diode-lights-clear-round-transparent-dc-long-lead-lighting-lamps","title":"Vrabocry 100 3mm 3V 20mA 29mm Bulb pcs Warm White LED Diode Lights Clear Round Transparent DC Long Lead Lighting Lamps","description":"\u003cdiv class=\"product-description\"\u003e\n\u003ch2\u003e100 pcs 3mm Warm White LED Diode Lights Clear Round Transparent DC 3V 20mA 29mm Long Lead Lighting Bulb Lamps Electronics Components Indicator Light Emitting Diodes\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eVrabocry 100 3mm 3V 20mA 29mm Bulb pcs Warm White LED Diode Lights Clear Round Transparent DC Long Lead Lighting Lamps\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eSpecification: Luminous modeConstant Light \/ 1.5Hz Blinking Light \/ Flickering Light Quantity: 100 pieces \/ Packs Lens: 3mm\/5mm Clear Round Transparent Viewing Angle: 20 Degree Forward Voltage \/ Current: 3V | 20mA Polarity: Anode (Longer Part) | Cathode (Shorter Part) Used For: Flickering Indicator, DIY PCB Circuit, Arduino, Raspberry Pi, Hobby, Science Experiments, Throwies Project, Breadboard, T1 T-1 Bulb, Bulk Parts Replacement\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBrand:\u003c\/strong\u003e Vrabocry\u003c\/p\u003e\n\u003cp\u003elight emitting, lights, diodes, lighting bulb, lead lighting, white, 100 pcs, electrical optoelectronic, diode lights, lighting, 20ma 29mm, 3mm warm Industrial \u0026amp; Scientific Industrial Electrical Optoelectronic Products Lamps LED Lamps\u003c\/p\u003e\n\u003ch3\u003eKey Features\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e✅ Micro led 2pin 2 pin Leads\u003c\/li\u003e\n\u003cli\u003e✅ Clear Transparent Round Small Lens\u003c\/li\u003e\n\u003cli\u003e✅ Parameters : DC 3 - 3.2 Volt 20 mA, Polarity (3 V) : Anode \"+\" (Longer Leg) | Cathode \"-\" (Shorter Leg)\u003c\/li\u003e\n\u003cli\u003e✅ Package: Pack of 100 Pieces led diode(Through Hole DIP 2pins leads mini LEDs Set)\u003c\/li\u003e\n\u003cli\u003e✅ Compatible with: Flickering Indicator, DIY PCB Board Circuit, Arduino, Raspberry Pi, Hobby, Science Experiments, Throwies Project, Breadboard\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eProduct Details\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e✅ Item Weight: 0.06 Pounds\u003c\/li\u003e\n\u003cli\u003e✅ Model Number: 3mm 5mm-100-us\u003c\/li\u003e\n\u003cli\u003e✅ Color: Warm White \/ 100pcs\u003c\/li\u003e\n\u003cli\u003e✅ Power Source: DC\u003c\/li\u003e\n\u003cli\u003e✅ Material Type: Plastic\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eShipping \u0026amp; Guarantees\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e✅ FREE standard shipping within the United States (3 6 business days)\u003c\/li\u003e\n\u003cli\u003e✅ 100% money-back guarantee for lost or damaged items\u003c\/li\u003e\n\u003cli\u003e✅ Secure checkout with encrypted payment processing\u003c\/li\u003e\n\u003cli\u003e✅ Shipping via UPS, FedEx, and USPS\u003c\/li\u003e\n\u003cli\u003e✅ Ships to lower 48 states only (no PO Boxes \/ APO \/ FPO)\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eReturns\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e✅ 30-day hassle-free returns\u003c\/li\u003e\n\u003cli\u003e✅ Items must be unused and in original packaging\u003c\/li\u003e\n\u003cli\u003e✅ Full refund if item is not delivered\u003c\/li\u003e\n\u003cli\u003e✅ Guaranteed delivery within 6 7 business days\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003ePayment Methods\u003c\/h3\u003e\n\u003cp\u003e✅ Credit Cards, PayPal, Shop Pay, Apple Pay, Google Pay, Amazon Pay, Meta Pay\u003c\/p\u003e\n\u003ch3\u003eCustomer Support\u003c\/h3\u003e\n\u003cp\u003e✅ Questions? Contact us at \u003cstrong\u003eSupport@GiftAbay.com\u003c\/strong\u003e\u003cbr\u003eWe respond within 24 hours on business days.\u003c\/p\u003e\n\u003c\/div\u003e","brand":"Vrabocry","offers":[{"title":"Default Title","offer_id":66870883844141,"sku":"PGABL2837405","price":8.94,"currency_code":"USD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0738\/6067\/7677\/files\/413tt-R1hQL._AC_SL1000.jpg?v=1781602486","url":"https:\/\/prosupply.giftabay.com\/products\/vrabocry-100-3mm-3v-20ma-29mm-bulb-pcs-warm-white-led-diode-lights-clear-round-transparent-dc-long-lead-lighting-lamps","provider":"ProSupply.GiftAbay","version":"1.0","type":"link"}