Hot
New
-10%
In stock
Out stock

Vrabocry 100 3mm 3V 20mA 29mm Bulb pcs Warm White LED Diode Lights Clear Round Transparent DC Long Lead Lighting Lamps

SKU: PGABL2837405

VENDOR: Vrabocry

$11.92$10.82

You Save: $1.10 (10%)

Hurry! Only 10 Left in Stock!

Free Shipping Across the United States

All orders within the United States qualify for 100% free shipping.

Fast Processing & Dispatch

All orders are shipped within 1 business day after purchase.

30-Day Free Returns

Not satisfied? You can return your order for free within 30 days after delivery.

PRODUCT INFORMATION
PRODUCT INFORMATION

100 pcs 3mm Warm White LED Diode Lights Clear Round Transparent DC 3V 20mA 29mm Long Lead Lighting Bulb Lamps Electronics Components Indicator Light Emitting Diodes

Vrabocry 100 3mm 3V 20mA 29mm Bulb pcs Warm White LED Diode Lights Clear Round Transparent DC Long Lead Lighting Lamps

Specification: Luminous modeConstant Light / 1.5Hz Blinking Light / Flickering Light Quantity: 100 pieces / Packs Lens: 3mm/5mm Clear Round Transparent Viewing Angle: 20 Degree Forward Voltage / Current: 3V | 20mA Polarity: Anode (Longer Part) | Cathode (Shorter Part) Used For: Flickering Indicator, DIY PCB Circuit, Arduino, Raspberry Pi, Hobby, Science Experiments, Throwies Project, Breadboard, T1 T-1 Bulb, Bulk Parts Replacement

Brand: Vrabocry

light emitting, lights, diodes, lighting bulb, lead lighting, white, 100 pcs, electrical optoelectronic, diode lights, lighting, 20ma 29mm, 3mm warm Industrial & Scientific Industrial Electrical Optoelectronic Products Lamps LED Lamps

Key Features

  • ✅ Micro led 2pin 2 pin Leads
  • ✅ Clear Transparent Round Small Lens
  • ✅ Parameters : DC 3 - 3.2 Volt 20 mA, Polarity (3 V) : Anode "+" (Longer Leg) | Cathode "-" (Shorter Leg)
  • ✅ Package: Pack of 100 Pieces led diode(Through Hole DIP 2pins leads mini LEDs Set)
  • ✅ Compatible with: Flickering Indicator, DIY PCB Board Circuit, Arduino, Raspberry Pi, Hobby, Science Experiments, Throwies Project, Breadboard

Product Details

  • ✅ Item Weight: 0.06 Pounds
  • ✅ Model Number: 3mm 5mm-100-us
  • ✅ Color: Warm White / 100pcs
  • ✅ Power Source: DC
  • ✅ Material Type: Plastic

Shipping & Guarantees

  • ✅ FREE standard shipping within the United States (3 6 business days)
  • ✅ 100% money-back guarantee for lost or damaged items
  • ✅ Secure checkout with encrypted payment processing
  • ✅ Shipping via UPS, FedEx, and USPS
  • ✅ Ships to lower 48 states only (no PO Boxes / APO / FPO)

Returns

  • ✅ 30-day hassle-free returns
  • ✅ Items must be unused and in original packaging
  • ✅ Full refund if item is not delivered
  • ✅ Guaranteed delivery within 6 7 business days

Payment Methods

✅ Credit Cards, PayPal, Shop Pay, Apple Pay, Google Pay, Amazon Pay, Meta Pay

Customer Support

✅ Questions? Contact us at Support@GiftAbay.com
We respond within 24 hours on business days.

Great Gifts.
Great Finds.
Great Prices.

At GiftAbay, we bring together a wide variety of quality products from many categories, helping you easily find the perfect item for gifting, daily use, or special occasions.

SHELLA - MULTIPURPOSE SHOPIFY THEME

Shella – premium, responsive, fashion Shopify theme. Our team puts years of web development experience into Shella theme. It includes same features as other themes at themeforest, plus some unique features which you can find only at Shella theme. Builder, true collection filter, fashion icons, etc. Enjoy Shella theme :)

This is a standard cookie notice which you can easily adapt or disable as you like in the admin. We use cookies to ensure that we give you the best experience on our website.

Vrabocry 100 pcs 3mm Warm White LED Diode Lights Clear Round Transparent DC

Vrabocry 100 3mm 3V 20mA 29mm Bulb pcs Warm White LED Diode Lights Clear Round Transparent DC Long Lead Lighting Lamps

$11.92$10.82